Engineers of the Indian Railways have developed a new tunnelling method to complete the construction of Tunnel-1 on the 111-km-long Katra-Banihal section of the Kashmir rail link project. The 3.2-km-long single tube tunnel, located at the foot of …
Tag:
Himalayan tunnelling method for tunnelling
-
Equipment NewsInfrastructure NewsRoads & HighwaysTop News






