J Kumar Infra projects in April-end was declared as the lowest bidder for the pre-engineered building (PEB) roof and architectural finishing contract at 5 stations of Mumbai Metro’s 23.6 km Line-2B …
Mumbai Metropolitan Region Development Authority
-
-
Larsen & Toubro (L&T) and Megha Engineering & Infrastructures Ltd. (MEIL) were declared as the lowest bidders for one package each of 11.84 km Thane – Borivali twin tunnel project’s …
-
Equipment NewsInfrastructure NewsRailway NewsTop News
MMRDA resumes Metro 2B work, ‘pillars to be up by 2024’
Mumbai Metropolitan Region Development Authority (MMRDA) has resumed work on Metro 2B (DN Nagar to Mandale) on a stretch of SV Road, Vile Parle, after disposal of a public interest …
-
Mumbai Metropolitan Region Development Authority (MMRDA) has estimated a 7.5% increase in cost of Lines 2A and 7, which became fully operational between Gundavli-Dahisar-Andheri on January 20. While Metro 2A …
-
The Mumbai Metropolitan Region Development Authority (MMRDA) plans to erect two bridges over Vaitarna river at Virar and Manor to improve road connectivity with Palghar. At the moment, the development authority …






