Gurugram-Sohna elevated Highway is all set to welcome passengers on the road.At every 2 kms, there will be an emergency button which will help to maintain the security of the passengers.
As per the report , a twenty-two lane toll has been prepared in Bhamraula village. Along with the installation of digital screens on tolls, preparations are also being made for toll collection from FASTag. After getting approval from the ministry for this, the file went to the National Highways Authority of India (NHAI) headquarters.
The construction work is going on between Rajiv Chowk and Badshahpur in the first package. Similarly, construction will be carried out between Badshahpur to Sohna in the second package on the elevated highway on Gurugram-Sohna road.
According to NHAI officials, the work is in the final stage. SOS boxes will be installed every 2 kms. There will be a button in it. On pressing it, information will reach the control room built in the toll plaza immediately. The GPS in the box will tell where the help is needed.