Monday, December 23, 2024
HomeBlogApplying for a Building Permit for a Commercial Project – Things That...

Applying for a Building Permit for a Commercial Project – Things That You Should Know About!

Orlando has developed from home to theme parks, which has made this city quite popular. Also, owing to a subtropical climate, it offers full-time residence and many job opportunities in proximity. Thus, people are choosing to find homes in and around this place. Taking this opportunity, many businesses have started acquiring Orlando building permits for their construction projects. 

If you are on the same page and want to expand your business, let me know how to get a commercial permit for the project in Orlando.

  • Step 1: Gather all necessary documents 

To get a building permit for a commercial project in Orlando, you must gather all the necessary documents and review the paperwork. The requirements usually vary based on the type of project and scope. The contractor and the owner sign and authorize the basic paperwork request permit application. Submit complete design drawings, cover sheets, and architectural plans, which include landscape, plumbing, mechanical aspects, and energy calculations. Usually, contractors seek services that tell them whether any special permit is required. 

  • Step 2: Complete the application 

After you have gathered all the documents and papers, complete the application and make sure everything is correct. You might have to go through separate applications based on the type of project, such as renovation or new construction. You can get this application on the city’s website. You can seek help from General Contractor Orlando Florida.

  • Step 3: Submit the plans 

The application you submitted in Orlando must go through several processes. After the checking, you will receive an email and an invoice for a non-refundable 25% deposit fee. You will next receive a link to the digital plan review system. After you make the payment, you can submit all your plans here. However, suppose your project exceeds $5000 in value. In that case, you must file a Notice of Commencement and the Orange County Comptroller’s. You also have to send a copy to the job site and the city of Orlando. 

  • Step 6: Review the comments 

Once an application is submitted, you must track the progress through the city’s Permit City tool. You have to stay updated, and based on the size of the project as well as other variables, the certificate time can vary. It can also go beyond eight weeks to unlock the initial review. You would get back the application along with several comments in case of projects with enormous scope. Address the comments and resubmit for a second review. The timeline can vary based on the severity of the comments, the number of comments you received, and the size of the project. 

  • Step 7: Receive the permit

When the Orlando building permit application is approved after review, you will receive an email regarding the outstanding invoice for the permit. Clear the payments; another email link will appear from where you can download the license. Again, you must print this scale and post it on the job site before the construction is initiated. 

Summing it up: 

Before starting the project, follow the city codes in Orlando, such as the Florida Building Code 8th edition, the National Electrical Code 2020, the FBC 2023 Energy Code, Florida-specific statutes, and the Orlando City Codes, and apply the code for the project.

Cover image-samuelsgroup.net

RELATED ARTICLES

Most Popular

Hot News