The Voice of Expertise – Solving problems in joints

0
1121
joints

Date: 11th September 2020, Time: 3:30PM – 4:45PM

Click here to Join the Webinar

How to solve your joint problems

The ongoing issue with industrial floor

“The weakest point of any floor is the joints, particularly construction joints, where you take two parts together and over time, with the passing of truck wheels, those joints break down very very quickly. So, the way to overcome that is to put in place an armored joint system”

– The functions of joints – Best practises

Types of  joints

Isolation – Construction – Expansion – Contraction

– Engineered armoured joints

Construction methods

Load transfer

Arris protection

Diagnosis of joints problems

– Joints repairs

Solutions (preventive maintenance – Signature AR – Stabilisation)

Round table, the presenters will discuss and answer the questions that participants can share live on the chat.